Recibir nuevas ofertas de empleo por email
  •  ...Provide resources for system configuration, PLC logic updates, HMI modifications, and recipe implementation. Conduct functional testing of automated controls and interfaces. Support troubleshooting, issue resolution, and change management activities. Ensure all... 
    Test
    Contrato
    Trabajo por turnos

    Flexible & Integrated Technical Services, LLC

    Guayama
    7 días atrás
  •  ...products at specified intervals to ensure conformance to requirements. ~Record carbon material field data, including numerical data, test results, photographs, or summaries of visual observations. Ensure compliance and collect required data of site requirements ~... 
    Test
    Tiempo completo
    CAS
    Inicio inmediato

    Mentor Technical Group

    Guayama
    Hace un mes
  •  ...Puerto Rico & USA. Responsibilities:  Develops and implements methods and procedures for process control, process improvement, testing and inspection to ensure that products are free of flaws and function as designed. Designs and installs sophisticated testing... 
    Test
    Temporal
    Trabajo por turnos
    Fin de semana

    Quality Consulting Group

    Salinas
    8 días atrás
  •  ...-QSR related topics. Design and/or implement methods and procedures for inspecting, testing, and evaluating the precision and reliability of products and/or production and/or test equipment: Statistical process control, Incoming part/product inspection criteria, Automated... 
    Test
    Temporal

    Stryker

    Arroyo
    1 día atrás
  •  ...activities, managing communication, assisting with requirement gathering and DevOps tasks, maintaining system documentation, and supporting testing and change control processes to ensure a smooth and successful rollout.  Duties:  Act as the coordination point between D&T... 
    Test
    Contrato

    QRC Group, Inc

    Cidra
    5 días atrás
  • $12,5 por hora

     ...DAILY BASIS/QUANTITATIVE TASKS ~Perform all regulatory procedures, which include HACCP, SSOP’s, Presentation, Pre-Chill Tests, Post-Chill Test, and AQL Giblets. These procedures include inspection of incoming materials, temperature checks, fecal contamination checks... 
    Test
    Temporal
    Turno de noche
    Trabajo por turnos

    JBS

    Aibonito
    1 día atrás
  •  ...will do Designs, validates and brings new products to market. Specifies precise new product functional requirements; designs, tests and integrates components to produce final designs; and evaluates the design's overall effectiveness, cost, reliability and safety.... 
    Test
    Temporal
    Tiempo completo
    Contrato

    Stryker

    Arroyo
    1 día atrás
  •  ...be readily available. ~ Determine need for upgrading HVAC systems and take measures to take necessary actions ~ Reassemble and test equipment following repairs. ~ Record and report all faults, deficiencies, and other unusual occurrences, as well as the time and... 
    Test
    Temporal
    CAS
    Inicio inmediato
    Fin de semana

    Mentor Technical Group

    Cidra
    Hace un mes
  •  ...critical utilities system.  Assist the Critical System Engineer in performing all activities related to calibrations, environmental tests, sterilization studies and critical systems compliance with legal, regulatory standards and the operation of the Utilities area... 
    Test
    Contratista
    Temporal

    Baxter International Inc

    Aibonito
    Hace un mes
  •  ...will do Designs, validates and brings new products to market. Specifies precise new product functional requirements; designs, tests and integrates components to produce final designs; and evaluates the design's overall effectiveness, cost, reliability and safety.... 
    Test
    Tiempo completo
    Contrato

    Stryker

    Arroyo
    29 días atrás
  •  ...functional requirements into precise machining programs and manufacturing instructions. Validate and adjust CNC programs through testing, first-article inspections, and production support. Collaborate with manufacturing, engineering, and external suppliers to... 
    Test
    Temporal
    Tiempo completo

    Stryker

    Arroyo
    1 día atrás
  •  ...equipment, lean concepts, analysis of specifications, reliability, and regulatory requirements. Work with quality engineers to develop testing and inspection process from an lean mindset.   What you need ~5+ years experience in the industry ~2+ years experience... 
    Test
    Temporal
    Tiempo completo

    Stryker

    Arroyo
    1 día atrás
  •  ...performed by the tool room resources. Performs changes to the procedures as required. May design and/or specify inspection and testing mechanisms and equipment (e.g. fixtures, etc.) What you need ~ B.S. in an Engineering discipline or a minimum of 8 years of experience... 
    Test
    Contratista
    Temporal
    Tiempo completo

    Stryker

    Arroyo
    1 día atrás
  •  ...alignment with timelines and operational readiness. Evaluate design effectiveness and implement engineering improvements based on testing and risk assessments. Document technical activities in compliance with regulatory and quality system requirements. What you... 
    Test
    Temporal
    Tiempo completo
    Trabajo híbrido

    Stryker

    Arroyo
    1 día atrás
  •  ...blueprint/schematic reading. Ability to operate small hand tools (e.g., pliers, screwdrivers, hammer, wrenches, etc.) power tools and test equipment. Advanced math, measuring and writing skills. Effective interpersonal communications skills. Demonstrate... 
    Test
    Contratista
    Temporal
    Contrato
    Trabajar en la oficina

    Stryker

    Arroyo
    1 día atrás
  •  ...technology experience. ~ Extensive experience conducting and documenting non conformance investigations. ~ Microbiology and sterility testing execution skills and high level proficiency in sterilization controls related matters. Health benefits include: Medical and... 
    Test
    De duración determinada
    Temporal

    Stryker

    Arroyo
    1 día atrás
  •  ...processes. Collaborating with cross-functional teams to understand project requirements and ensure successful implementation. Testing and troubleshooting PLC systems ensure proper functionality. Modifying and optimizing existing PLC programs to improve... 
    Test
    Temporal
    Turno de noche
    Trabajo por turnos

    Baxter International Inc

    Aibonito
    9 días atrás